Fort Lee Campus II

Design build project
Prefabricated ductwork systems
Direct downloaded ductwork from TSI/BIM 3D models to factory
Utilized Trimble unit to spot equipment and hangar locations for over 250,000 pounds of duct on the project.
Aluminized steel ductwork with special sealant for high temp tank exhaust systems

Skills

Posted on

November 6, 2018