Design build project Prefabricated ductwork systems Direct downloaded ductwork from TSI/BIM 3D models to factory Utilized Trimble unit to spot equipment and hangar locations for over 250,000 pounds of duct on the project. Aluminized steel ductwork with special sealant...
Design build project Prefabricated 80% of ductwork prior to steel being erected on site Direct downloaded product from BIM model to factory Utilized Trimble unit to spot hanger locations
Design Build Project Over 175,000 Pounds of duct directly downloaded from 3D BIM model to our manufacturing plant Duct pre-fabricated in assemblies to minimize field labor Louver plenums over 100’ in...